Kontan | Take note! The 2021-2030 RUPTL will be published in December, entry into force from January 2021
KONTAN.CO.ID – JAKARTA. The government is finalizing changes to the Electricity Supply Business Plan (RUPTL). The target is that the
KONTAN.CO.ID – JAKARTA. The government is finalizing changes to the Electricity Supply Business Plan (RUPTL). The target is that the
Norman Harsono | The Jakarta Post The government is considering to shut down the aging Suralaya coal-fired power plant (PLTU) in
Norman Harsono | The Jakarta Post The government is considering to shut down the aging Suralaya coal-fired power plant (PLTU) in
Jakarta – Access to modern and reliable energy, including electricity, is an essential service and an important prerequisite for sustainable development.
KOMPAS – JAKARTA — Jakarta: Kementerian Energi dan Sumber Daya Mineral (ESDM) akan mengurangi penambahan kapasitas pembangkit listrik sebesar 10-15 gigawatt
KOMPAS – JAKARTA — Sumber potensi energi terbarukan di Indonesia terus dioptimalkan untuk mengganti pembangkit listrik berbahan bakar minyak ataupun
KOMPAS – JAKARTA — Pemerintah berkomitmen mengurangi pembangunan pembangkit listrik tenaga uap atau PLTU pada masa mendatang. Adapun PLTU yang berusia
KONTAN.CO.ID – JAKARTA. Sejumlah pihak masih berupaya mendesak supaya isu pemanfaatan nuklir dihapus dalam pembahasan Rancangan Undang-Undang Energi Baru Terbarukan (EBT).
Solidarity and Just Transition Silesia Declaration Reviving Silesia Silesia or referred to as Upper Silesia is a province in
Energy transition, a shift from fossil-based energy to renewable energy, is a global phenomenon. The threat of climate change,
KONTAN.CO.ID – JAKARTA. Tak lama lagi pemerintah akan menerbitkan Peraturan Presiden tentang Harga Pembelian Tenaga Listrik Energi Terbarukan oleh PT Perusahaan
The International Renewable Energy Agency (IRENA) reports that renewable energy (RE) has made up the majority of capacity additions for