• Version
  • Download 1050
  • File Size 11.3 MB
  • File Count 1
  • Create Date 29 May 2023
  • Last Updated 29 May 2023

Delivering Indonesia’s Power Sector Transition: Costs, Benefits, and Implications of Intervening the 13.8 GW Coal-fired Power Plants Project Pipeline. 2023 [EN]

Attached Files

File
IESR (2023). Delivering Indonesia’s Power Sector Transition

Leave a comment