IESR
  • About Us
  • Annual Impact Report
  • Careers
  • Contact
  • About Us
  • Annual Impact Report
  • Careers
  • Contact
  • Publication
    • Study Report
    • Annual Report
  • News & Insight
    • Press Release
    • Media Coverage
    • Event Coverage
    • Blog
    • Transition Unpacked
    • Media Contact
  • Data & Tools
    • Carbon Footprint Calculator
    • Levelized Cost of Electricity
    • IESR – ESMI
    • Solar Power Calculator
    • Indonesia Energy Policy Simulator
  • Programs
    • Sustainable Energy Access
    • Green Economy
    • Sustainable Mobility
    • Energy and Power System Transformation
    • Projects & Initiatives
  • Events
  • Multimedia
    • Infographic
    • Podcast
    • Video
    • Photo’s
  • Publication
    • Study Report
    • Annual Report
  • News & Insight
    • Press Release
    • Media Coverage
    • Event Coverage
    • Blog
    • Transition Unpacked
    • Media Contact
  • Data & Tools
    • Carbon Footprint Calculator
    • Levelized Cost of Electricity
    • IESR – ESMI
    • Solar Power Calculator
    • Indonesia Energy Policy Simulator
  • Programs
    • Sustainable Energy Access
    • Green Economy
    • Sustainable Mobility
    • Energy and Power System Transformation
    • Projects & Initiatives
  • Events
  • Multimedia
    • Infographic
    • Podcast
    • Video
    • Photo’s
  • English
  • Indonesian

Who will bear the risks for the First-of-a-Kind (FOAK) Nuclear Power Plant in Indonesia?

Blog30 March 20241KViews0Likes0Comments
In the latest draft of Indonesia's national energy policy (KEN) and its roadmap, the introduction of a nuclear power plant (NPP) is scheduled for 2032. Initially, it is planned to contribute 250 MWe, comprising 0.4% of the energy mix, with a projected by this policy to be increased up to 11.4% by 2060 within the…

Read More

Kata Data | Government Should Be Careful in Developing Nuclear Power Plants

Media Coverage1 December 2023743Views0Likes0Comments
The government is required to be careful in developing nuclear power plants (PLTN). The development of nuclear power plants causes a number of risks that should be carefully considered. Read more on Kata Data.

Read More

Shaping the Ecosystem for a Just and Accelerated Low-Carbon Energy Transition

pkv games
bandarqq
dominoqq
bandarqq
pkv games
bandarqq
dominoqq
pkv games
pkv games
bandarqq
dominoqq
Subscribe Newsletter

Jl. Tebet Timur Dalam Raya No.109 B-D, RT.5/RW.6, East Tebet, Tebet, South Jakarta City, Jakarta 12820

 

 iesr@iesr.or.id

 +62 21 22323069

 +62 21 22323069

Press Release

Contact Us

Careers

Request for Proposal

Privacy Policy

Internal

Indonesia Energy Transition Outlook

Indonesia Energy Transition Dialogue