BACKGROUND
Institute for Essential Services Reform (IESR), a think tank based in Jakarta, Indonesia, has been working intensively to promote the acceleration of low carbon energy transition in Indonesia, through evidence-based policy advocacy. For the past 5 years, IESR also has been contributing significantly to promoting energy transition discourse in Indonesia and has been working with national and local governments, associations, and civil society organizations.
IESR is currently conducting technical assistance to provide detailed and comprensive input regarding JETP priority projects that are not yet in the RUPTL or provide input on the list of new projects outside of the potential mentioned in the RUPTL and JETP. Several projects on our proposal plan consist of one site solar PV, and one site of a Wind Turbine Power plant which has a capacity generation minimum 100 MW. Additionally, two pre-feasibility study will be conducted for the energy storage project.Â
This request for proposal is to obtain the best services available to provide IESR with the preliminary survey of the selected locations and installation of measurement instruments.
Proposal Timeline:
Proposals will be accepted until 10:00 p.m. Indonesian Western Standard Time (WIB, GMT+7) on Sunday, 23 June 2024. Any proposals received after this date and time will be regarded as inadmissible. All proposals must be signed by an official agent or company representative submitting the proposal. Kindly address Program Manager Energy Transformation IESR at deon@iesr.or.id, Research Manager at raditya@iesr.or.id, Program Officer Energy Transformation rahmat@iesr.or.id for inquiries. Please include “RFP Response – Prefeasibility Study Consultant” in the subject line
Evaluation of proposals will be conducted from 23 June through 25 June 2024. Follow-up with the top three candidates will be conducted within this window to obtain any necessary clarification on items described within the proposals.
The selection decision for the winning bidder will be made by 26 June 2024.
Upon notification, the contract negotiation with the winning bidder will begin immediately and must proceed extremely quickly to meet the project timeline.
RFP-Surveyor-for-Preliminary-Assessment-for-PV-Wind-and-Energy-Storage
Download